open books

Submitted by Earle Birney on Mon, 06/21/2010 - 15:56

I grabbed the swat team (EO, Matt, Bert, Yohanna, Ted, and Andrea) and we got the stucco done in a day.  The cabin is now essentially sealed in and the outside is more or less done (save a deck and a door and the 10 foot area that still needs painting b/c we ran out of paint).

At this point I am gonna pull back a little bit and relax enough to help some other people on their building projects, enjoy the end of term, try to sleep a little more, etc.  

Here is the accounting (I am trying to keep things open for others to see - in hopes it will help them with budgets - and as well to keep in line with the organizational policy of keeping open books for projects that involve donated money).  

This is the cost for getting sealed in.  I think the total is $18,400 to date.  I feel like I am $5000 away from being able to finish up to a minimal level (still looking for a solar fridge option - if anyone has a spare one kicking around, let me know...)  - which is quite exciting and manageable. 

 

 

date expenses
contractor fee 400
generator 550
design (Bert) 750 wages
nail gun 50
pad/septic
permit
solar still 240
03/09/10 Lumber / supplies 2508.76
tarp 10
03/16/10 poly 22
post beam hardware 398
03/26/10 rebar and cement block 45
03/21/10 Bert 400 wages
03/21/10 Jeff – transpo 700 wages
03/21/10 tools (level, ext cord...) 60
03/31/10 Hardware – floor 21
03/31/10 2x8x10 – floor 121
nails 81
Mortar – pooper 20
Block – pooper 25
04/05/10 apoxy 30
04/05/10 use of rtv 20
04/08/10 800 wages
04/13/10 460 wages
04/13/10 gas 50
04/13/10 wood for wall, roof sheetingposts, etc 1620
04/30/10 570 wages
04/26/10 wood (walls) SL 175
04/24/10 Nails / wood (HD) 39
04/29/10 wood and nails ($55) SL 241
05/02/10 tools 14
05/03/10 trusses 825
05/03/10 stucco paper and wire 108
05/03/10 Stucco and roofing materials (HD) 2440
05/08/10 nails 53
05/09/10 wages 450 wages
05/10/10 windows 690
05/10/10 wood and hardware (beams) 220
05/30/10 2x4, osb, roof nails, winsdow wrap 215
05/30/10 roof stuff (paint frip[ edge flashing 34
05/30/10 osb, 1x6 125
05/30/10 misc 25
05/30/10 rtv 50
05/30/10 gas 45
05/30/10 wages 420 wages
06/10/10 wages 420 wages
06/10/10 stucco stuff 40
06/10/10 doors 250
06/10/10 Wood + misc 170
06/10/10 window wrap, screws 50
06/10/10 tape, flashing, staples (stucco prep) 76
06/18/10 stucco trash bags 100
06/18/10 stucco prep (flashing staples) 35
06/18/10 wages 630 wages
06/18/10 tires 723